Drgem X Ray Service Manual Install

Use a radiation survey meter to verify that housing leakage radiation remains well below standard regulatory thresholds.

Wire the room safety interlocks, such as radiation warning lights and door switches, directly to the designated interlock terminals on the generator control board.

: Verify walls and doors meet regional radiation safety requirements (typically 1.5mm to 2.0mm lead equivalence). drgem x ray service manual install

The exact of your Drgem generator (e.g., GXR-52S, Diamond, Compact system)

Provide a copy of the room's radiation survey report to the facility's Radiation Safety Officer (RSO). Use a radiation survey meter to verify that

Complete a full radiation survey around the room perimeter to ensure zero leakage or unsafe scatter.

Wire the room door switches to the "Door Interlock" terminals on the generator board. The system must not expose radiation if a door is open. Component Cables The exact of your Drgem generator (e

Lay down the floor rails parallel to the intended center line of the patient table.

Route the incoming 3-phase lines to the main terminal block inside the generator.