A standard Tower Crane Foundation Design spreadsheet requires three categories of inputs:
Based on the site and crane loads, you input a trial design. This is often an iterative process within the spreadsheet.
A tower crane foundation is a critical component of the crane's overall structural system. A poorly designed foundation can lead to a range of problems, including:
Combine crane loads with foundation self-weight:
N_ik = (F_k + G_k)/n ± (M_yk × x_i)/Σx_j² ± (M_xk × y_i)/Σy_j²
Formulas processing individual pile forces using the equation:
Verify that resisting moment exceeds overturning moment by a sufficient safety factor:
A standard Tower Crane Foundation Design spreadsheet requires three categories of inputs:
Based on the site and crane loads, you input a trial design. This is often an iterative process within the spreadsheet.
A tower crane foundation is a critical component of the crane's overall structural system. A poorly designed foundation can lead to a range of problems, including:
Combine crane loads with foundation self-weight:
N_ik = (F_k + G_k)/n ± (M_yk × x_i)/Σx_j² ± (M_xk × y_i)/Σy_j²
Formulas processing individual pile forces using the equation:
Verify that resisting moment exceeds overturning moment by a sufficient safety factor: